Selected working area should be barricaded to avoid accidents damages.
Safe work method statement wall and floor tiling.
Below is the step wise safe work method of statement for ceramic wall tiles installation.
Move the required tiles ordinary portland cement and adhesive cement to the designated work area.
Apply the mortar to the back of tile and tap in into place at the required level position to the wall.
Click on the links below to take you to prepared work method statements.
Obtain necessary clearances and approvals from engineers including mep clearance.
Method statement for tiling at walls for concrete block walls and concrete walls to be finished with tile apply a leveling coat of plaster minimum 12 mm thick sufficient to cover the unevenness of the substrate and to make walls true vertical.
Safe work method statements tiling services workplace health and safety have developed a range of approved safe work method statements for the performance of activities and other tasks associated with the undertaking of tiling at a workplace.
Here is detailed construction procedure or method statement for installation of ceramic floor tiles which can be used for any kind of works.
Obtain necessary clearances and approvals from engineers including mep clearance before putting the tiles on walls.
This method statement defines the activities and the sequences which are to be carried out and to describe in general the methodology to be used in work execution related to ceramic floor tiling works for name of project to ensure compliance with the conditions of contract contract specifications and health safety and environmental requirements consistent with the approved drawings relevant specifications and boq.
This safe work method statement for tiling is free and editable so you can customise it and use it the way you want.
Mix the cement and adhesive cement thoroughly with clean water.
Identify and mark the wall file finishes level from the design drawings.
Plaster shall be finished rough in order to have a strong key for tiling works.
Selected working area should be barricaded to avoid accidents damages.